• Home
  • About
  • Process
  • Projects
  • Field Guide
  • Contact
  • We’re Hiring!
May 8, 2015
Blog, Construction, Design, Projects

Bendemeer // Framing

Bendemeer // Framing
May 8, 2015
Blog, Construction, Design, Projects

 

20150508_5904Job site visits during framing is exciting to us as the form of the building is really revealed at this stage in construction.  Here we can get a feel for the compound of boxes that are perched above the site that comprise this project.

20150508_5903 Framing stage is also a good time for us to check back in on how the project aligns with design intent for site placement.  This particular project we worked hard to preserve the site’s beautiful beach trees.  Not only preserve, but highlight each of them with the architecture.

20150508_590820150508_5909 20150508_5910

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

We also take time to look over potential exterior materials and stains to select a few for site mockups.  Involving the owner, contractor, and architect in this discussion is critical.

20150508_5912

 

Previous articleAIA Honor Awards // Lake Allegan ResidenceNext article SandCastle // Post-Construction

Recent News

Bendemeer Residence // Gabion WallsJuly 16, 2016
IDa // Open HouseOctober 30, 2015
Outdoor Discovery Center // open houseSeptember 30, 2015
Dogwood Residence // UnderwayJune 18, 2015
SandCastle // Post-ConstructionJune 17, 2015

Categories

  • Blog
  • Construction
  • Design
  • Heron Cove
  • Materials
  • News
  • Projects
  • Slideshow
  • Technical
  • Uncategorized
  • Update

OFFICE

201 W Washington St, Suite 250
Zeeland, MI 49464 USA

EMAIL AND PHONE

info@lucidarc.com
616-741-0044

Careers

© Lucid Architecture · All Rights Reserved